李荣贵

发布者:系统管理员发布时间:2015-06-10浏览次数:179

 

李榮貴

Tel: +886-3-5731996

E-mail: rkli@cc.nctu.edu.tw

經歷
新竹交通大學工業工程與管理系所教授,碩博士生指導教授,EMBA教授

曾擔任工業工程與管理系系主任,工業工程研究研究所所長,管理學院副院長

學歷

台灣科技大學工業管理學士(1979)

美國亞歷桑那州立大學工業工程碩士與博士(1986)

研究興趣:

制約理論應用,供應鏈管理,項目管理。策略決策分析

發表期刊論文

1.       R. K. Li and S. Adiga. “A Part-Feature Recognization System: A Vital Link in the Integration of CAD and CAM”. Recent Developments in Production Research, Edited by A. Mital, Elsevier Publishers (1987. pp. 581 – 588)

2.       S. Adiga andR. K. Li. “Research in the Application of AI Techniques to Generative Process Planning in Manufacturing”. Modern Production Management Systems, Edited by A. Kusia, North-Holland Publishers (1987. pp.587 – 598)

3.       Rong-Kwei Li. A Part Feature Recognition System for Rotational Parts”. International Journal of Production Research (Volume 26, Number 5. 1988. pp. 1451 – 1475)

4.       R. K. Li and D. Bedworth. “A Framework for the Integration of CAD/CAPP”. Computer and Industrial Engineering (Volume 14, Number 3. 1988. pp. 395 – 413)

5.       Rong-Kwei Li and Tai-Zen Hwang. “An Extraction of a Part Feature Recognition System for Rotational Parts – No-Turning Features”. International Journal of Computer Integrated Manufacturing (Volume 2, Number 5. 1989. pp. 257 – 267)

6.       Der-Baau Perng, Zen Chen and Rong-Kwei Li. “Automatic 3D Machining Features Extraction from 3D CSG Solids”. Computer Aided Design (Volume 22, Number 5. 1990. pp.285 – 295)

7.       Rong-Kwei Li and Ming-Hwang Yu. “A Framework for the Prismatic Part Data Recognition – Unit-Machining Loop Concept”. International Journal of Computer Integrated Manufacturing (Volume 3, Number 2. 1990. pp.96 – 111)

8.       Rong-Kwei Li and Shen-Der Tzieng. “Machinable Volumes Extraction – Raw Materials to Finished Parts”. Internal Journal of Computer Intergrated Manufacturing (Volume 4, Number 4. 1991. pp.241 – 252)

9.       R. K. Li and H. J. Hsu. “A Two-Stage Feature Based Design Concept”. International Journal of Production Research (Volume 29, Number 1. 1991. pp.133 – 154)

10.   Shi-Lih Chen, Zen Chen and Rong-Kwei Li. “Drawing Graph Representations for Rotational Parts”. Internal Journal of Computer Intergrated Manufacturin (Volume 4, Number 1. 1991. pp. 45 – 56)

11.   Rong-Kwei Li andChun-Long,Hwang. “Assembly Code Generation from Feature-Based Geometric Models”. International Journal of Production Research (Volume 30, Number 3. 1992. pp.627 – 646

12.   Rong-Kwei Li and Chun-Long Hwang. “A Framework for Automated DFA System Development”. Computers and Industrial Engineering (Volume 22, Number 4. 1992. pp.403 – 413)

13.   R. K. Li, Y. M. Du and T. Yang. “Applying the Concepts of Variation Geometry to Feature-Based Design”. International Journal of Production Research (Volume 31, Number 7. 1993. pp.1521 – 1540)

14.   Rong-KweiLi, Yu-Tang Shyu and Sdash Adiga. “A Heuristic Rescheduling Algorithm for Computer-Based Production Scheduling Systems”. International Journal of Production Research (Volume 31, Number 8. 1993. pp.1815 – 1826)

15.   M. C. Liu, C. T. Tsai, S. K. Liang and R. K. Li. “A Multi-Echelon Evaluation Framework for CIM System Design”. International Journal of Computer Integrated Manufacturing (Volume 7, Number 4. 1994. pp.201 – 214)

16.   Horng-Huei Wu and Rong-Kwei Li. “A New Rescheduling Method for Computer-Based Scheduling Systems” International Journal of Production Research (Volume 33, Number 8. 1995. pp. 2097 – 2110)

17.   Horng-Huei Wu and Rong-Kwei Li. “Capacity Constraint Resources Wandering and its Wandering Behaviors in a Production Plant”. CIIE (Volume 12, Number 1. 1995. pp. 63 – 69)

18.   Rong-Kwei Li, Chan-Yi Lin and Horng-Huei Wu. “A Feature Modification Framework for Feature-Based Design Systems”. International Journal of Production Research (Volume 33, Number 2. 1995. pp. 549 – 563)

19.   Horn-Huei Wu and Rong-Kwei Li. “A Methodology for Schedule Compression”. International Journal of Production Planning and Control (Volume 7, Number 4. 1996. pp.407 – 417)

20.   Sheng-Hung Chang, Wen-Liang Lee and Rong-Kwei Li. “A Manufacturing Bill for Material Planning”. International Journal of Production Planning and Control (Volume 8, Number 5. 1997. pp. 437 – 450)

21.   S. G.Chen, M. Z. Wu and Rong-Kwei Li. “Design of a Rule-Based Flexible Manufacturing System using the Modified IDEF0 Methodology”. International Journal of Production Research (Volume 35, Number 10. 1997

22.   T. H. Tsai and R. K. Li. “Integrated Due Date Assignment Rules”. International Journal of Production Research (Volume 35, Number 12. 1997. pp.3379 – 3392)

23.   S. H. Chang and R. K. Li1997“ECN Decision Model—Long lead time production environment” CIIEVol 14, Number 2, pp. 195-207

24.   C. H. Tsai and R. K. Li1997, “Capacity Constraints Due Day performance study” CIIE, Vol 14, no 3, pp 305-318

25.   H. H. Wu and R. K. Li1997, “Production Schedule and reschedule problem study” CIIEVol 14, Number 2, pp.147-158

26.   S. G. Chen, M. Z. Wu and R. K. Li. “Design of a Rule-Based Continuous Process Controller using the Modified IDEF0 Methodology”. International Journal of Industrial Engineering (Volume 4, Number 3. 1997. pp167 – 178)

27.   Y. M. Du and R. K. Li. “A Constraint Time Buffer Determination Model”. International Journal of Production Research (Volume 36, Number 4. 1997. pp. 1091 – 1103)

28.   C. L. Huangetl and R. K. Li. “An Order Releasing Method to Avert Bottleneck Shifting in Semiconductor Wafer Manufacturing” CIIE(Volume 15, Number 5. 1998. pp. 449 – 456)

29.   C. H. Tsai, W. Y. Shyu, Y. M. Feng and R. K. Li. “A Novel Hybrid Dispatching Rules in Wafer Fabrication Factories”. Journal of the Ta-Hwa Institute of Technology (Volume 14. 1998. p.301 – 310)

30.   Tseng, Hwia-En and Rong-Kwei Li. 1998“Using AHPfor Design Decision”Design Journalvol 3. No 1, pp. 43-54

31.   Tseng, Hwia-En and Rong-Kwei Li. “A Novel Means of Generating Assembly Sequences Using the Connector Concept”. International Journal of Intelligent Manufacturing (Volume 10, Number 5. 1999. pp. 423 – 436)

32.   C. L. Huang and R. K. Li. “The Construction of a Production Performance Prediction System for Semiconductor Manufacturing with Artificial Networks”. International Journal of Production Research (Volume 37, Number 6. 1999. pp. 1387 – 1402)

33.   T. Y. Tseng, R. K. Li. “Mixing the Macro and Micro Flow Time Estimation Model – A Wafer Fab Example”. International Journal of Production Research (Volume 37, Number 11. 1999. pp 2447 – 2461)

34.   Tseng, Hwia-En and Rong-Kwei Li.1999“Connector Based design Model”CIIEvol 16, no 3, pp. 353-361

35.   S. H. Chang, etl and R. K. Li1999, ”Constraint based dispatching model for IC Fab”CIIEvol 16, no 2, pp. 209-220

36.   L. C. Lin, etl, R. K. Li1999”Flexible Flow design model—IC assembly”Web Journal of Chinese Management ReviewVolume2, Number5

37.   T. H. Tsai, C. Y. Tseng and R. K. Li1999, "Order releasing and botttleneck dispatching management system design"Web Journal of Chinese Management Review, Volume 2, Number 2, p.51-66

38.   W. L. LouT. H. Tsai and R. K. Li1999, "Linear incremental demand replenishment policy "Web Journal of Chinese Management Review, Volume 2, Number 3, p.97-105

39.   T. H. Tsai and R. K. Li.1999, "A heusristic scheduling system for job-shop environment"Web Journal of Chinese Management ReviewVolume 2, Number 4, p.11-21

40.   K. Z. Yang, etl. Rong-Kwei Li1999Constraint-based rework and scrap model for IC FabWeb Journal of Chinese Management Review, Volume 2, Number 6

41.   T. Y. Tseng and R. K. Li2000, ”MPS study under demand uncertainty environment”CIIEvol 17, no 6, pp.615-630

42.   T. H. Tsai and R. K. Li. “A Novel Due-Date Oriented Scheduling Heuristic for Cellular Manufacturing System”. The International Journal of Industrial – Theory, Application and Practice (Volume 7, Number1. 2000. pp 76 – 88)

43.   W. Y. Louetl. Rong-Kwei Li2000"Linear incremental demand replenishment policy—using matrix resolution approach"CIIEVolume 17, Number 1, pp15-23

44.   K. S. Wang, etl. Rong-Kwei Li, 2000Integrated Product design model designWeb Journal of Chinese Management Review, Volume 3, Number1

45.   C. L. Huang, etl, Rong-Kwei Li2001“Bottleneck shifting study”CIIEVol 18, no4, pp73-81

46.   S. H. Changetl. And . K. Li2001”Mix Production Control for IC Fab”CIIEVol 18, no4, pp59-72

47.   L. C. Lin, J. W. Chang, L. H. Chang, C. H. Tsai and R. K. Li. “Enhancement of Production Efficiency in the IC Packaging Industry via a Computerized WIP and Scheduling System”. International Journal of the Computer, the Internet and Management (Volume 9, Number 1 . 2001)

48.   L. C. Lin, C. H. Tsai, K. Y. Chen and R. K. Li. “Designing a Flexible Production Flow Using IDEF1x -- an IC Packaging WIP System”. International Journal of the Computer, the Internet and Management (Volume 9, Number 2. 2001)

49.   K. S. Chen, S. C. Chen and R. K. Li., 2001, “Quality Analysis of CapacitorsQuality Reviewvol 8, no1.

50.   K. S. Chen, M. L. Huang and R. K. Li. “Process Capability Analysis for an Entire Product”. International Journal of Production Research (Volume 39, Number 17. 2001. pp. 4077 – 4087) .

51.   L.-C. Lin, J.-W. Chang, L.-H. Chang, C.-H. Tsai and R.-K. Li, 2001, "Enhancement of Production Efficiency in the IC Packaging Industry via a Computerized WIP and Scheduling System,"International Journal of the Computer, the Internet and Management,Vol 9 #1 

52.   L.-C. Lin, C.-H. Tsai, K.-Y. Chen and R.-K. Li, 2001, "Designing a Flexible Production Flow Using IDEF1x -- an IC Packaging WIP System,"International Journal of the Computer, the Internet and Management,Vol 9 #2

53.   K. S. Chen, M. L. Huang and R. K. Li, 2001, ”Process Capability Analysis for an Entire Product”, International Journal of Production Research, Vol. 39, No. 17,4077-4087.

54.   Chen, K. S., Chen, S. C. and Li, R. K., (2002) “Process Quality Analysis of Products,”International Journal of Advance Manufacturing Technology, 19, 623-628

55.   Liao, S. J.,Chen, K. S., and Li, R. K., (2002) “Capability Evaluation for Processes of the Larger-the-better Type for non-normal populations,”Advances and Applications in Statistics, 2(2), 189-198.

56.   Chen, K. S., Li, R. K., andLiao, S. J.(2002) “Capability Evaluation of A Product Family for Processes of The Larger-the-better Type,”International Journal of Advance Manufacturing Technology, 20, 824-832

57.   Huang, M. L.,Chen, K. S.and Li, R. K., (2003) “Process Capability Evaluation for a PVC Pipe Product Family”,The Asian Journal on Quality,3(1), 61-70.

58.   Sheng-Hung Chang, Ping-Feng Pai, Kuo-Jung Yuan, Bo-Chang Wang, Rong-Kwei Li., “Heuristic PAC model for hybrid MTO and MTS production environment,”International Journal of Production Economics, 85, 347-358, 2003.

59.   Kuo-Jung Yuan, Sheng-Hung Chang and Rong-Kwei Li, 2003,“Enhancement of TOC Replenishment Using a Novel Generic Buffer Management Procedure,”International Journal of Production Research, pp725-740.

60.   Chih-Hung Tsai, Yun-Min Feng & Rong-Kwei Li, 2003, “A Hybrid Dispatching Rules in Wafer Fabrication Factories,International Journal of the Computer, the Internet and Management,Vol 11 no1. pp.64-72.

61.   C.-H. Lo, Y.-H. Lin, C.-H. Tsai and R.-K. Li, 2003, "A Case Study of ERP Implementation Project for PCB Manufacturer," Asian Journal On Quality, Vol. 4, No. 1, pp.160-174.

62.   C. F. Ho and Rong-Kwei Li, 2004, “TDD/IDD Dispatching Rules developed,“International Journal of Production Research,V42(24), 5133-5147

63.   Chen, K. S., Li, R. K. and Liao, S. J., “Process capability analysis of a product family of larger-the-better type,”Journal of Information & Optimization Sciences, 2004, Vol. 25, No. 1, 93-104

64.   Chen, K. S., Chen, K. L. and Li, R. K. “Measuring Services Quality based on Number of Customer Complains”,Journal of Interdisciplinary Mathematics, 2002, Vol. 7, No. 1, 113-124.

65. Chen, K. S., Chen, K. L. and Li, R. K.,“Contract Manufacturer Selection by Using the Process Incapability Index Cpp,”International Journal of Advanced Manufacturing Technology,2005,Vol. 26, 686-692.

66. Liu T. C., Li R. K., Chen M. C., “Development of an Artificial Neural Network to Predict Lead Frame Dimensions in an Etching Process”,International Journal of Advanced Manufacturing Technology, accepted in June 2004, Published online in April 2005.

67. Hsu-Hao Yang, T. C. Liu and R. K. Li "Clustering Data to Improve Packaging for the Semiconductor Industry",計量管理學刊, Vol 1, 13-23. (2004)

68.  T. C. Liu, R. K. Li, " A new Art-Counterpropagation neural network for solving a forecasting problem",Exper Systems With Applications,28, 21-27. (2005)

69.   Chen, K. L., Chen, K. S. and Li, R. K.,2005, “Suppliers Capability and Price Analysis Chart”,International Journal of Production Economics 98(3), 315-327. 

70.   Huang, M. L.,Chen, K. S. and Li, R. K., “Graphical Analysis of Capability of a Process Producing a Product Family”,Quality & Quantity, October 2005, Vol. 39, No. 5, 643-657

71.   T.F. Hoand R. K. Li “Bottleneck-based heuristic dispatching rule for optimizing mixed TDD/IDD performance in various factories”International Journal of Advance Manufacturing Technology (IJAMT) 2008, Vol. 36, No. 7-8 

72.   Y.-C. Lin, C.-H. Tsai, R.-K. Li, C.-P. Chen and H.-C. Chen, (2008), "The Study
of the Cycle Time Improvement by Work-In-Process Statistical Process Control
Method for IC Foundry Manufacturing," The Asian Journal On Quality, Vol. 9,
No. 3, pp.71-91.

73.   J. H. Lee and R. K. Li “Why High DDP is difficulty to achieve” APICS Journal of production and inventory management,Vol 46, No.1, PP.30-45, 2009

74.    C. K. Lin, H. C. Chen, R. K. Li, C. P. Chen and C. H. Tsai, Research on increasing the production yield rate by Six Sigma method: A case of SMT process of main board, The Asian Journal On Quality, Vol. 10, No.1, pp.1-24. 2009

75.   K. W. Zheng, C. H. Tsai, R. K. Li, C. P. Chen, The development of the distribution/VMI game based on TOC, The Asian Journal On Quality, Vol. 10, No.1, pp.53-76, 2009

76.   C. H. Liu, H. P. Chiu and R. K. Li, Optimizing the Usability of Mobile Phones for Deaf Individuals,Assistive Technology Journal. Volume 22, No1, pp. 115-127, 2010

77.   H. P. Chiu, C. H. Liu and R. K. Li, Essential needs and requirements of mobile phone for the deaf,Assistive Technology Journal.Volume 22, No1, pp. 172-185, 2010

78.   J.H. Lee, J.G. Chang, C.H. Tsai and R.K. Li, Research on enhancement of TOC simplified Drum-Buffer-Rope system using novel generic procedure,Exper Systems With Applications. Vol37, 3747–3754, 2010

79.   Chia-Ling Huang, Hao-Ging Chang, Rong-Kwei Li, and Chih-Hung Tsai. Using Game and Statistical Analysis to Confirm Goldratt’s Logical Analysis of Bad On-Time Deliver in A Multi-Project Environment. South African Journal of Industrial Engineering, Vol. 22(2), pp. 133-150, 2011.

80.   Ching-Kuo Wei, Liang-Chih Chen, Rong-Kwei Li, Chih-Hung Tsai,Exploration of efficiency underestimation of CCR model: Based on medical sectors with DEA-R model,Exper Systems With Applications, Vol 38, 3155–3160, 2011

81.   C.-K. Wei, L.-C. Chen, R.-K. Li, C.-H. Tsaiand H.-L. Huang, 2012, "A Study of Optimal Weights of Data Envelopment Analysis – Development of a Context-Dependent DEA-R Model,"Expert Systems with Applications,Vol. 39, No. 4, pp.4599-4608.

82.    H.-E. Chin, R.-K. Liand C.-H. Tsai, 2012, “Designing a supply chain system to maximize replenishment efficiency: A simulation investigation,”International Journal of Management,Vol. 29, No. 2, pp.492-503.

83.   Huang, C.-L., T.-W. Jian, R.-K. Li, Y.C. Chungand C.-H. Tsai, 2012, “Using a game to overcome two obstacles in adopting Pull system in a make-to-stock production plant,”International Journal of Academic Research in Business and Social Sciences,Vol. 2, No. 6, pp.495-521.

84.    Huang, C.-L., H.-C. Chen, R.-K. Liand C.-H. Tsai, 2012, “A comparative study of the critical chain and PERT planning methods: no bad human behaviors involved,”International Journal of Academic Research in Business and Social Sciences,Vol. 2, No. 8, pp.379-394.

85.   Huang, C.-L.,Kuo-Jung Yuan, andR.-K. LiAn Experimental Study to Determine Whether the Push or PullApproach is Better for a Distribution SystemThe Journal of International Management Studies, Volume 7 Number 2, October, 2012

86.   Low C, Li, R. K. and Chang, C. M. Integrated scheduling of production and delivery with time window. International Journal of Production Research, 51(3) 897-909, 2013

87.   Low C, Chang, C. M., Huang, C. L. and Li, R. K., Coordination of production scheduling and delivery problem with heterogeneious fleet, International Journal of Production Economics (Second revise), 2013